So far today, I have ordered an anchor bag, cut a yoga mat into strips to form the base of the sleeping platform, and grommeted two vinyl tablecloths together to serve as the boat tent. Still to come: errands (boat related), drinks and the circus, and then doing wiring.
4 months ago